Education Range

At HB Homes & Commercial, we take pride in showcasing our innovative range of educational buildings. Through dedicated research and development, we have curated the ideal solution to cater to your educational requirements. From classrooms to resource rooms and ablution blocks, our offerings are designed to elevate the learning environment and support educational excellence. Explore our collection of educational buildings to witness the perfect blend of functionality, aesthetics, and sustainability.

Built for Education

Hawke's Bay Homes Education range of buildings designed, constructed and delivered without the issue. We have developed several construction methods to be able to deliver either completed buildings or fabricated components without causing disruption to the school.

Enhanced Learning Pods

Similar to the pre-fabricated components however the components are connected into pre-fabricated pods.

Whichever method you choose, onsite construction time is reduced by approximately 90%. Any on-site foundation work can be carried out during school holiday periods, further minimizing any disturbance to the school’s staff and pupils.

Why choose Hawke's Bay Homes and Commercial?

Transportable

A building is fully completed before being transported to its final location

  • Sustainable timber materials used
  • Energy efficient; double glazed and increased R values for insulation
  • Low E glazing with thermal spacer + safety glass
  • Allow for potential changes in future requirements
  • Automatically controlled lux levels
  • Acoustically enhanced
  • Suspended ceilings with acoustic tiles
  • Maximum natural light

Modular

Where several buildings are required to be linked together

  • Well ventilated
  • Expansive exterior covered verandah
  • Options on ‘maintenance-free’ materials
  • Services for; data, fire, wireless internet, audio and visual requirements
  • Heat pump
  • Options for solar energy
  • Designed to be modular and also pre-fabricated
  • 50 year lifespan

Pre-Fabricated

Our buildings are completed in the factory in Hastings and then transported to the final location.

  • Less disruption to your school, staff and pupils
  • Higher quality control
  • Better control of sub contractors
  • Reduced construction time frames
  • No down time due adverse weather
  • Reduced Health and Safety risks
  • Ability to store buildings offsite until required